Only Chris Henwood, Robson Hewitson and Richard De Sadeleer were present. Robson prepared the left hand connecting rod for removal, Richard cleaned out the smokebox and then assisted Chris trying to clear some blocked tubes. Chris also removed the safety valves and started work cleaning and inspecting the boiler door holes. Not enough was done however, to prepare the boiler for the planned cold exam on the Monday, so this also was cancelled and will be done when the boiler inspector comes to do the re-arranged Q6 steam test.