K1 update 6th October 2021

Print

If a picture paints a thousand words then attached is a 2000 word report.

K1 with cab split ready for cab and boiler lift

Boiler on flat waggon outside boiler shop.

Many thanks to Angie Buxton, Steve Gibson, Rolly Bingham and Frank Hryniewicz (who travelled from Wolverhampton and stayed in the coach for a night) who have all done at least one day on the K1 since the last report and to West Coast for organising the crane (which did 3 lifts on the day) and overseeing the lift of our boiler.