North Eastern Locomotive Preservation Group

  • Increase font size
  • Default font size
  • Decrease font size

24/25 November 2021

Print

On arrival at the MPD Ian Pearson was told that the J27 had failed its examination after washout because of three broken stays somewhere above the firebox. Chris Henwood is now in discussion with the NYMR about the arrangements for their replacement, and in particular its timing - whether it could/should be done by the NYMR before the Santas when it was planned to be used or left for NELPG to carry out over the winter period.